You received a milestone notice from the city
The 180-day Phase One window starts when the association receives the notice. Send it to CSI with the building information for a defined inspection proposal.
Understand the Florida milestone process →Construction Solutions, Inc. performs milestone inspections and Structural Integrity Reserve Studies for condominium and cooperative associations in Jacksonville and the Duval County beaches. Jacksonville adds its own ordinance on top of the state law, and the inspection has to satisfy both.
Jacksonville and Duval County
Choose the path that matches the board's notice, funding decision, or visible building condition.
The 180-day Phase One window starts when the association receives the notice. Send it to CSI with the building information for a defined inspection proposal.
Understand the Florida milestone process →Separate the reserve study's long-range funding role from the milestone inspection's current structural-safety question.
Review Florida SIRS requirements →Share the property address, building age, the city notice or prior reports, and the board's schedule.
Request a Jacksonville proposal →Ponte Vedra Beach branch officeFlorida P.E.-led inspectionsMilestone and SIRS coordinationFixed-fee proposals
If your association governs a condominium or cooperative building three or more habitable stories tall in Jacksonville, two layers of rules apply to the milestone inspection, plus the state SIRS requirement:
Chapter 328 follows the structure of the state milestone law but sets out several local requirements that affect how the inspection is scoped and reported. The city summarizes them on its Condo and Co-Op Milestone Inspections page; the points below are the ones boards ask about most.
For buildings with balconies, the city's Phase One definition calls for inspection of at least 33 percent of the balconies, handrails, or similar components. On a large tower that is a significant access and scheduling task, and it should be planned with management before field work starts.
The inspector submits a sealed report, along with a separate summary of material findings and recommendations, to the association and to the building official. The city lists specific Phase One contents, including condition ratings for listed components, color photographs, an overall structural assessment, a statement on whether Phase Two is required, and the inspector's qualifications and certificate of insurance.
The ordinance defines who may serve as the inspector, including a Florida-licensed architect or engineer with multi-story structural design experience and minimum insurance coverage, and it sets a report review fee of 1.5 percent of the cost of the inspection and report. Confirm the current fee with the Building Inspection Division before budgeting.
Phase One is a visual examination of habitable and non-habitable areas, a review of available records, and a qualitative assessment of the structure. Phase Two is required only when Phase One identifies substantial structural deterioration, and it may use destructive or nondestructive testing to fully assess the areas of distress. Our Florida milestone inspection page walks through both phases in detail.
Milestone findings also feed the association's Structural Integrity Reserve Study. Repairs identified in a Phase One or Phase Two report affect the remaining useful life and replacement timing of the components the SIRS must fund, so performing the two together keeps the reserve schedule consistent with the actual condition of the building.
Riverfront mid-rise and high-rise condominiums deal with humidity, river exposure, and older post-tensioned and conventionally reinforced concrete. Parking structures and plaza decks over occupied space are frequent sources of findings.
Oceanfront buildings face wind-driven rain and chloride exposure that accelerate balcony and facade deterioration. Each beach city has its own building official, so the local submission process differs from the City of Jacksonville's.
For CSI's broader structural and forensic work in the area, see structural engineering in Jacksonville. When milestone findings point to leaks rather than structure, water intrusion testing locates the source before repairs are designed. CSI also serves St. Johns County through milestone inspections in Ponte Vedra Beach and Nassau County through milestone inspections in Nassau County.
Neither option requires a commitment, a signed agreement, or a prior engagement. Pick whichever better fits your board's stage.
An FAA Part 107-certified pilot and a licensed engineer conduct a twenty-minute exterior aerial assessment of your Jacksonville property. The board receives a preliminary findings memorandum identifying visible concerns such as balcony spalling, roof membrane failure, parapet deterioration, or envelope waterproofing issues that warrant closer engineering review. No cost and no obligation.
Principals from Construction Solutions, Inc. present directly to association boards, virtually or at your property, explaining your building's current condition indicators, the requirements that apply, and how to sequence inspections, studies, and repairs. Free. No subsequent engagement required.
Yes. In addition to Florida Statute 553.899, the City of Jacksonville adopted Ordinance 2022-842-E, now Chapter 328 of the Ordinance Code. It sets the city's notice process, the 180-day window to complete Phase One after an association receives written notice, the requirement that the inspector submit reports through the Building Inspection Division's permitting system, and a report review fee. The city publishes the details on its Condo and Co-Op Milestone Inspections page.
Under Section 328.107 of the Ordinance Code, the association must complete Phase One within 180 days after receiving the written notice described in Section 328.106. The city treats Phase One as complete when the inspector who performed it submits the report to the Building Inspection Division through the division's permitting system, or by another method the division chief authorizes in writing.
Jacksonville Beach, Atlantic Beach, and Neptune Beach are separate municipalities with their own building officials. The state milestone requirements apply to covered buildings in each, but the notice, submission, and fee procedures are set locally. Confirm the process with the building official for the city where your building is located, or call CSI and we will check it for you.
Yes. Associations with covered buildings of three or more habitable stories also need a Structural Integrity Reserve Study, updated at least every 10 years. CSI regularly schedules the milestone inspection and the SIRS so that field work and findings feed both documents, which avoids a second mobilization and keeps the two reports consistent.
3203 Sawgrass Village Circle
Ponte Vedra Beach, Florida 32082
Phone: (904) 261-8703
Email: info@csidesign.com
Hours: Monday through Friday, 8:00 AM to 5:00 PM
CSI does not keep a separate Jacksonville office. Duval County work is staffed from the Ponte Vedra Beach branch and the Fernandina Beach headquarters.
CSI Ponte Vedra Beach office.
A complimentary drone survey of your Jacksonville property is a practical first look at the current condition of the building envelope and structure. No commitment and no cost.
Request Drone Survey