Roof
A roof can leak at a drain or a parapet while the surrounding membrane still looks sound. CSI traces these connections to help boards decide between a local repair and a broader roof investigation.
Engineering Confidence. Protecting Property.
Florida milestone inspections, SIRS, and building envelope diagnostics for condominium boards across Florida, Georgia, and South Carolina. Established in 1995.
From milestone inspections and structural integrity reserve studies (SIRS) to forensic testing, CSI delivers engineering solutions that protect buildings across Florida, Georgia, and South Carolina.
SB 4-D compliance inspections and structural condition assessments for condominiums and commercial buildings.
Water intrusion testing, moisture diagnostics, and building envelope forensic investigations.
High-rise facade inspections using drone technology and ground-level visual assessment protocols.
Interactive informational 3D model of a Florida condominium building. Explore the Roof, Envelope, Balconies, Windows, Structure, and Foundation systems using the buttons below the model; each system includes an assembly view, component information, and a diagnostic path. Focus the model and use the arrow keys to rotate it. Home resets the view.
A roof can leak at a drain or a parapet while the surrounding membrane still looks sound. CSI traces these connections to help boards decide between a local repair and a broader roof investigation.
A stain inside a unit can appear well below the opening where rain entered. The wall section shows how flashing and the drainage plane should carry water back outside.
A balcony repair can involve the concrete slab, railing anchors, and waterproofing in the same area. CSI evaluates their condition together so the board can define one coordinated repair scope.
Water at a sill can come through the window, the perimeter joint, or the surrounding wall. Testing each area separately helps the association choose the right repair.
Slabs, beams, and columns carry loads through the building. When an engineer documents distress, its location along this path helps determine where closer investigation is needed.
Changes in floor elevation or recurring cracks can warrant a movement survey. Comparing measurements over time helps distinguish ongoing movement from an older condition.
Our engineers use 3D modeling to show exactly how your building is constructed and where problems originate.
Animated 3D model showing how water enters through improperly integrated window-to-wall connections in a brick veneer wall system.
3D animation tracing water entry at the base of a brick veneer wall caused by reverse-shingled flashing.
Animated walkthrough showing how compromised waterproofing membranes allow water to penetrate balcony deck connections.
3D model demonstrating water intrusion at the balcony-to-wall flashing transition.
Original tile, arches, and railings before the west-side walkway restoration.
CSI provided engineering and construction oversight through concrete repairs, arch reconstruction, sloped topping, decorative waterproofing, and replacement handrails.
A milestone inspection evaluates a building’s structure. A structural integrity reserve study (SIRS) estimates what an association needs to set aside for major repairs and replacements.
If your building’s milestone inspection is due by this date, your association may complete its initial SIRS alongside that inspection. Both must be finished by the cutoff. Check your local inspection notice for the building’s due date.
Senate Bill 4-D became law. Later amendments set different first-study dates for cooperatives and condominiums.
Buildings that turned 30 before July 1, 2022 had to complete their first milestone inspection before December 31, 2024. Covered cooperatives had an initial SIRS deadline of December 31, 2024.
Buildings that turned 30 from July 1, 2022 through December 30, 2024 had to complete their first milestone inspection before December 31, 2025. Covered condominiums had an initial SIRS deadline of December 31, 2025.
These rules generally cover residential condominium and cooperative buildings with at least three habitable stories. One- to four-family dwellings with three or fewer habitable stories above ground are exempt. The initial SIRS dates above apply to associations in existence on or before July 1, 2022 that are controlled by unit owners.
The usual first milestone inspection is due by December 31 of the year the building turns 30, measured from its certificate of occupancy. The local enforcement agency can require an inspection at 25 based on local conditions, or grant a first-inspection extension for good cause. Milestone inspections recur every 10 years. A SIRS is generally required at least every 10 years.
For budgets adopted on or after December 31, 2024, covered owner-controlled associations generally must fund the required SIRS items. The date the board adopts the budget matters.
For budgets adopted through December 31, 2028, an eligible association with a milestone inspection completed in the prior two calendar years may reduce or pause contributions for up to two annual budgets to pay for recommended repairs. A majority of all voting interests must approve. After a pause, a new SIRS is required before contributions resume.
A separate provision allows a study to be delayed for up to the two budget years immediately following a qualifying inspection so the association can fund recommended work. Have association counsel confirm eligibility before relying on a delay.
When the owner receives the local agency’s written milestone notice, the 180-day period to complete Phase 1 begins.
If Phase 2 identifies substantial structural deterioration, repairs must begin within 365 days after the local enforcement agency receives the Phase 2 report. Check the local ordinance for an earlier deadline to schedule or start the work.
A milestone inspection is required for qualifying residential condominium and cooperative buildings three habitable stories or higher. Under Florida Statute 553.899, the statewide default is Phase 1 by December 31 of the year the building reaches 30 years of age, then every 10 years. A local enforcement agency may use a 25-year schedule when local circumstances justify it; there is no automatic statewide coastal-distance trigger. Phase 2 is required only when Phase 1 identifies substantial structural deterioration. Call (904) 261-8703 to confirm the schedule for your building.
A Structural Integrity Reserve Study (SIRS) is required for covered residential condominium and cooperative buildings three habitable stories or higher, subject to statutory exclusions. It combines a visual inspection of eight statutory categories with remaining-useful-life, replacement-cost, and reserve-funding analysis. The study must be performed or verified by a licensed engineer, licensed architect, certified reserve specialist, or professional reserve analyst. CSI's licensed Professional Engineers perform SIRS engagements statewide. Call (904) 261-8703 for details.
CSI serves clients throughout Florida, Georgia, and South Carolina. We have offices in Fernandina Beach and Ponte Vedra Beach, Florida. Our team regularly works on projects from Jacksonville and St. Augustine to St. Simons Island, GA and the South Carolina coast. We also serve Central and South Florida communities. Contact us at (904) 261-8703 or info@csidesign.com.
The cost depends on the building size, number of units, scope of work, and type of inspection required. CSI provides detailed proposals with transparent pricing for every project. Contact us at (904) 261-8703 or request a building evaluation. We typically respond within 1 to 2 business days.
Yes. CSI provides forensic engineering investigations and expert witness testimony for construction defect cases. Our licensed engineers have extensive experience evaluating building failures, documenting deficiencies, and presenting findings in legal proceedings. We work with associations, property managers, and attorneys across the Southeast. Call (904) 261-8703 to discuss your situation.
Absolutely. Property management companies are one of our primary client groups. We work closely with CAMs and management firms to coordinate inspections, evaluations, repair projects, and reserve studies for the communities they manage. We understand the reporting and communication needs that property managers require. Reach out at (904) 261-8703 or info@csidesign.com.
Tell us about your building and our engineering team will reach out within 24 hours with a tailored assessment plan.
Call Us
Fernandina Beach
961687 Gateway Boulevard #101C
Ponte Vedra Beach
3203 Sawgrass Village Circle